Steel & Concrete Reinforcement Specialist

S C Forrest Contractors Ltd carries out a comprehensive range of reinforcement work, including wall reinforcement, ground beam reinforcement and slab reinforcement to name a few. Our skilled fixers are capable of following architectural drawings to specification.

Foundations & Form Work Specialist

We are a specialist formwork subcontractor and we can design, supply and fix purpose built timber panelled formwork to meet most requirements. We offer our services through either a competitive tendered fixed rate price, on measured rates or on a day rate

WELCOME TO SC FORREST CONTRACTORS

S C Forrest Contractors Ltd is a well-established Yorkshire based contracting company that specialises in steel reinforced concrete.

We operate nationwide and have gained a solid reputation in the industry been reliable and delivering the highest standard in workmanship.

We have a loyal and developing customer base, providing a wide spectrum of high quality services which include steel fixing, formwork and concreting applications. Operating predominantly within industrial, civil and commercial sector.

S C Forrest Contractors Ltd ensure that health, safety and well-being of anyone within their reach whilst undertaking work is top priority. We ensure that all safety systems are in place before we start any job such as detailed method statements and risk assessments.

Whether working as a single contractor or alongside other specialists, we have both the skills and capacity required to contribute towards construction projects and site development contracts of a significant size and subsequent value.

We offer our services through either a competitive tendered fixed rate price, on measured rates or on “day rate” (labour only) basis dependant on our client’s needs.

All work is considered and all enquires are welcome

some of the Services we offer...

Latest Portfolio

Client: Plasmore Ltd – Concrete Storage Bunker. We was instructed by Plasmor to construct 5 storage bunkers to hold building materials for their site at Great Heck. Method: Firstly the rebar was fixed into position with starter bars set to the required dimensions, then a 6 inch kicker was fitt

Read News »

Client: Plasmore Ltd – Fixing Reinforcement. We was instructed by Plasmor to place and fix reinforcement for a new plant building at their Knottingley site. Method: Fixing of 25.47 tons of High Yield Steel. The rebar was fixed in accordance with the architectural drawings to lines and levels d

Read News »